croton_point_sampling_2021_raw
Selenium Silver Thallium Vanadium Zinc Alkalinity as Calcium Carbonate 100 1000 50 1000 100 1000 50 20 10 10 10 10 10 10 50 10 10 10 20 20 10 20 80 5 BioChemical Oxygen Demand Asp Calcium by ICP-AES Chloride - ASP ASP Total Cyanide Chemical Oxygen Demand Color, Apparent ASP Hardness as Calcium Carbonate Hexavalent Chromium, ASP ASP Mercury Units RR-4 RR-4 2018 2020 10/31/2018 3/2/2020 RR-4 2021 5/4/2021 ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L mg/L 2" 15.85' 6.5' 9.35' 7.02'-6.5' <LOQ 81900 2180 28600 6790 11800 980 <LOQ <LOQ 108 <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ 983 <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ 282 2" 15.85' 6.4' 9.45' 7.1'-6.4' <LOQ 44900 3440 16900 3580 12300 990 <LOQ <LOQ 108 <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ 3130 <LOQ <LOQ <LOQ <LOQ <LOQ 170 237 2" 15.85' 6.9' 8.9' 7.6'-6.9' <LOQ 53700 7770 19400 4990 15900 2020 <LOQ <LOQ 172 <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ 3890 10.4 <LOQ <LOQ <LOQ <LOQ 200 23 2 1000 5 0.01 5 mg/L ug/L mg/L mg/L mg/L <LOQ 81900 5 0.015 35 <LOQ 44900 7 <LOQ 25 <LOQ 53700 31 0.11 8 1 1 40 0.2 units mg/L ug/L ug/L 30 320 <LOQ <LOQ 5 180 <LOQ <LOQ 75 210 <LOQ <LOQ Croton Point Sanitary Landfill Railroad 1 Landfill, NYSDEC Site #360001 Post Closure Monitoring and Sampling Report, Table 6 (RR4): Groundwater Constituent: Sampling Period: Sampling Date: DL/LOQ Units ASP Magnesium Ammonia as N Nitrite Nitrogen as N N-Nitrate Calculated Corrosivity/pH 1000 0.05 0.01 0.05 0.1 ug/L mg/L mg/L mg/L units Phenolics, Total Recoverable ASP Metal Digestion - Aqueous NH4 Preparation 0.025 mg/L Sulfate, Aqueous Total Dissolved Solids Total Kjeldahl nitrogen as N-ASP Total Organic Carbon Turbidity 1 mg/L 2 mg/L 0.5 mg/L 0.1 mg/L as C 0.02 NTU 1,2-dibromo-3-chloropropane 1,2-dibromoethane 2-hexanone Acetone Acetonitrile Acrolein Acrylonitrile Carbon Disulfide Methyl lodide Prep. Method Trans-1,4-dichloro-2-butene Vinyl Acetate 0.5 0.5 5 10 50 5 5 5 5 1,1,1-trichloroethane 1,1,1,2-tetrachloroethane 1,1,2,2-tetrachloroethane 1,1,2-trichloroethane 1,1-dichloroethane 1,1-dirchloropropane 1,2,3-trichlorobenzene 1,2,3-trichloropropane 1,2,4-trichlorobenzene 1,2,4-trimethylbenzene 1,2-dichlorobenzene RR-4 RR-4 2018 2020 10/31/2018 3/2/2020 28600 <LOQ <LOQ 0.327 6.94 16800 <LOQ <LOQ 0.226 7.25 RR-4 2021 5/4/2021 19400 <LOQ 0.0159 0.337 7.2 <LOQ 0.005 Not Detected Complete Complete Complete Complete Complete Complete 32.7 338 1.04 10.2 21 28.7 296 0.612 4.92 50.4 21.7 236 0.911 3.93 165 5 5 ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ Croton Point Sanitary Landfill Railroad 1 Landfill, NYSDEC Site #360001 Post Closure Monitoring and Sampling Report, Table 6 (RR4): Groundwater Constituent: Sampling Period: Sampling Date: 1,2-dichloroethane 1,2-dichloropropane 1,3,5-trimethylbenzene 1,3-dichlorobenzene 1,3-dichloropropane 1,4-dichlorobenzene 2,2-dichloropropane 2-butanone 2-chlorotoluene 4-chlorotoluene Benzene Bromobenzene Bromochloromethane Bromodichloromethane Bromoform Bromomethane Carbon tetrachloride Chlorobenzene Chloroethane Chloroform Chloromethane cis-1,2-dichloroethane cis-1,3-dichloropropene Dibromochloromethane Dibromomethane Dichlorodifluoromethane Ethylbenzene Hexachlobutadiene Isopropylbenzene Methyl iso-butyl ketone Methyl tert butyl ether Methlene Chloride Naphthalene N-Butylbenzene N-propybenzene O-xylene P & M-xylene P-isopropyltoluene SEC-butylbenzene Styrene DL/LOQ Units 0.5 0.5 0.5 0.5 0.5 0.5 0.5 2 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 2 0.5 0.5 0.5 0.5 0.5 0.5 1 0.5 0.5 0.5 ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L RR-4 RR-4 2018 2020 10/31/2018 3/2/2020 <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ RR-4 2021 5/4/2021 <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ <LOQ Croton Point Sanitary Landfill Railroad 1 Landfill, NYSDEC Site #360001 Post