am. CLF crew changed well heads at EW-69 and EW-92. CLF crew had meeting with Mario and Lou about migrating gas and the work that had been done to correct the problem. During this time the Pump Station project was still active and another bypass was created at Pump Station 1. We proceeded to monitor the bypass daily to prevent another spill. Greased blowers and exercised valves at Flare. Took monthly readings of flow meter. Collected data on CLF and RR1. CLF crew removed woodys from flare area and around CLF. Greased blowers and exercised valves at Flare. Took monthly readings of flow meter. Found and marked anchor trench along gas migration area for upcoming bore testing. CLF crew created access road to monitor well 1. CLF crew removed water from vaults on RR1. Collected data on CLF and RR1. CLF crew removed stumps on RR1 from previous tree removal. Flare shut down at 6:40am due to power outage. Flare automatically restarted at 6:50am. CLF crew removed water from vaults on RR1. Took monthly readings of flow meter. Greased blowers and exercised valves at Flare. CLF crew installed signs on CLF for park. Signs direct people to stay on paths. Collected data on CLF and RR1. Flare shut down at 9:30am due to power outage. We monitored the restart at 9:45am. Greased blowers and exercised valves at Flare. Took monthly readings of flow meter. CLF crew took surface readings with the NA-1000 in the area of gas migration. No new problem areas were discovered. Flare shut down due to failure of louver control. CLF crew fixed and restarted flare. 2017 Work and Activity Performed May 11, 2017 • May 15, 2017 May 18-25, 2017 May 31, 2017 • • • • • • • • June 8, 2017 June 26-29, 2017 July 3, 2017 July 6, 2017 • • July 10, 2017 • • July 13 2017 • July 17-21, 2017 • August 8, 2017 • • August 22-25, 2017 • September 2, 2017 • • September 11-22, 2017 • September 25-29, 2017 • October 6, 2017 • • October 12, 2017 • October 13-18, 2017 • October 19, 2017 • • October 25, 2017 November 11, 2017 • • • November 20-24, 2017 • • December 8, 2017 • • • Flare shut down due to power outage. Monitored and restarted the flare. Flare down for service by LFG. Collected data on CLF and RR1. Changed Yokogawa card CLF crew removed water from EW-73 Greased blowers and exercised valves at Flare. Took monthly readings of flow meter. Collected data on CLF and RR1. CLF crew used a TVA-1000 to sample the area of migration on the west side of CLF. No new hot spots were found. Greased blowers and exercised valves at Flare. Took monthly readings of flow meter Shut down Flare so we could replace nitrogen tank at inlet. Repaired roads on CLF after storm damage. CLF crew removed water from vaults on RR1. Collected data on CLF and RR1. Greased blowers and exercised valves at Flare. Took monthly readings of flow meter. CLF crew collected data on CLF and RR1. Greased blowers and exercised valves at Flare. Took monthly readings of flow meter. CLF crew collected ground water samples from monitor wells on CLF and RR1. CLF crew collected data on CLF and RR1. Greased blowers and exercised valves at Flare. Took monthly readings of flow meter. CLF crew greased storm water gate at bulkhead. CLF crew collected data on CLF and RR1. CLF crew along with help from LFG replaced RR1 valve at the Flare. CLF crew replaced well heads at EW-18, EW-19, and EW-21a. Replaced old heads with a slow flow valve from QED. LFG service of Flare. Greased blowers and exercised valves at Flare. Took monthly readings of flow meter. Collected data on CLF and RR1. Removed water from vaults on RR1. Greased blowers and exercised valves at Flare. Took monthly readings of flow meter. Drained water from header at EW-73. 2017 Work and Activity Performed December 19-22, 2017 • • Collected data on CLF and RR1. Removed water from vaults on RR1. 2018 Work and Activity Performed January 9, 2018 • Flare shut down. Changed the nitrogen tank and monitored the restart. • Greased blowers and exercised valves at Flare. • Took monthly readings of flow meter. January 12, 2018 January 22-24, 2018 January 30, 2018 • • • February 9, 2018 • Greased blowers and exercised valves at Flare. • Took monthly readings of flow meter. • Collected data on CLF and RR1. • Flare shut down at 11:00am due to power outage. Power was down due to storms in the area. CLF crew was able to restart the Flare on the 8th when power came back on. • Greased blowers and