800 words

down. Changed the nitrogen tank and monitored the restart. • Greased blowers and exercised valves at Flare. • Took monthly readings of flow meter. January 12, 2018 January 22-24, 2018 January 30, 2018 • • • February 9, 2018 • Greased blowers and exercised valves at Flare. • Took monthly readings of flow meter. • Collected data on CLF and RR1. • Flare shut down at 11:00am due to power outage. Power was down due to storms in the area. CLF crew was able to restart the Flare on the 8th when power came back on. • Greased blowers and exercised valves at Flare. • Took monthly readings of flow meter. • Collected data on CLF and RR1. • CLF crew took surface readings and bar tests of gas migration area. Same results were found as previously stated. • Collected data on CLF and RR1. • Repaired roads on CLF after storms. • CLF crew removed water from wells on CLF. • Greased blowers and exercised valves at Flare. • Took monthly readings of flow meter. February 26-28, 2018 March 2-9, 2018 March 12, 2018 March 23-25, 2018 April 3, 2018 April 23-24, 2018 April 30, 2018 May 8, 2018 May 10, 2018 CLF crew changed gauges on nitrogen tank. Collected data on CLF and RR1. Removed water from vaults on RR1 and from header on CLF. May 15, 2018 • May 21-22, 2018 • Collected data on CLF and RR1. • Flare shut down at 4:00pm on May 22 due to a power outage. The flare automatically restarted at 4:15pm. • Greased blowers and exercised valves at Flare. • Took monthly readings of flow meter. • Collected data on CLF and RR1. • LFG came an installed new touch panel on flare and also performed its yearly service. • Flare was on and off all weekend due to power outages. As of Monday the flare is running normal. • Greased blowers and exercised valves at Flare. • Took monthly readings of flow meter • Flare shut down due to power outage at 9:00am. Power came back at 1:00pm and we monitored the restart of the flare. June 13, 2018 June 18-19, 2018 June 27, 2018 July 2, 2018 July 13, 2018 July 18, 2018 Flare shut down at 6:30 due to flame loss. Turned off north line 2018 Work and Activity Performed July 19, 2018 July 23, 2018 July 24-27, 2018 August 4-6, 2018 August 22-25, 2018 August 28, 2018 September 7, 2018 September 12, 2018 September 19-21, 2018 September 24, 2018 October 1, 2018 • Monitor well RFW-4 was damaged by a village of croton tractor. The CLF crew replaced the damaged outer casing of the well and poured a new concrete pad. • Flare shut down due to low nitrogen. CLF crew replaced the tank and monitored the restart of the flare. • Collected data on CLF and RR1. • Flare shut down on the 4th at 6:00pm due to a power outage. We manually restarted the flare at 7:00am on the 6th. • Greased blowers and exercised valves at Flare. • Took monthly readings of flow meter. • CLF crew collected data on CLF and RR1. • Replaced the hose for the nitrogen tank due to the old on being dry rotted. • Flare shut down at 1:30am due to power outage. CLF crew restarted the flare at 7:00am. • Greased blowers and exercised valves at Flare. • Took monthly readings of flow meter. • CLF crew collected data on CLF and RR1. • Flare kept shutting down during the weekend due to high 02 in the North header. CLF crew closed the North header and the Flare was able to stay running. • Flare shut down due to power outage. Monitored the restart of the flare at 7:45am. 2018 Work and Activity Performed October 9-10, 2018 • Greased blowers and exercised valves at Flare. • Took monthly readings of flow meter. • LFG servicing of flare. Also replaced the bearings in blower B while on site. October 12, 2018 • CLF crew surfaced sampled gas migration area. No new hot spots were located. • Flare shut down due to power outage at 5:30pm. The flare came back on at 6:00pm when the power returned. • CLF crew surfaced sampled all gas wells on CLF and RR1 with TVA-1000. No hot spots were located during sampling. • CLF crew collected data on CLF and RR1. • CLF crew began ground water monitoring samples. Over the next month samples were collected on RR1, CLF, the Hudson River and surrounding pump stations. Sampling ended on November 26, 2018. October 14, 2018 October 17-19, 2018 October 22-25, 2018 October 26, 2018 October 27-30, 2018 November 9, 2018 November 28-30, 2018 December 3, 2018 December 14-17, 2018 • Flare shut