Home / croton_point_landfill_review_2019_raw.txt / Passage

croton_point_landfill_review_2019_raw

657 words

came back on at 6:00pm when the power returned. • CLF crew surfaced sampled all gas wells on CLF and RR1 with TVA-1000. No hot spots were located during sampling. • CLF crew collected data on CLF and RR1. • CLF crew began ground water monitoring samples. Over the next month samples were collected on RR1, CLF, the Hudson River and surrounding pump stations. Sampling ended on November 26, 2018. October 14, 2018 October 17-19, 2018 October 22-25, 2018 October 26, 2018 October 27-30, 2018 November 9, 2018 November 28-30, 2018 December 3, 2018 December 14-17, 2018 • Flare shut down due to power outage. The flare restarted when power returned on October 30, 2018 at 7:30am. • Greased blowers and exercised valves at Flare. • Took monthly readings of flow meter. • Collected data on CLF and RR1. • Removed water from vaults on RR1. • Greased blowers and exercised valves at Flare. • Took monthly readings of flow meter. • Drained water from header at EW-73. • Collected data on CLF and RR1. • Removed water from vaults on RR1. 2019 Work and Activity Performed January 2,2019 January 4-7, 2019 January 9, 2019 January 10, 2019 January 11-14, 2019 January 15, 2019 January 18, 2019 January 23, 2019 • • • • • • • • January 24, 2019 January 25, 2019 • • • January 28, 2019 • • • February 1, 2019 • February 4, 2019 • February 26, 2019 February 27-28, 2019 March 1, 2019 March 14, 2019 March 25, 2019 • • • • • • • • • • April 4, 2019 • April 5, 2019 • February 5-11, 2019 February 12, 2019 February 19, 2019 April 8, 2019 April 12-18, 2019 • • • • • • Opened north line at 2:00pm Collected data for CLF and RR1 Changed grease in blowers and switched blower C to A Computer went down, could not retrieve any data Collected data for CLF and RR1 Main computer went down Collected data for CLF and RR1 Chris from Cornerstone took gas well readings an TVA readings on North Line Collected data for CLF and RR1 Pumped out gas wells on RR1. Chris from Cornerstone came to readings on NorthLine & BAR. Test & TVA gas migration area. Collected data for CLF and RR1. Gas well readings on RR1. Chris came from Cornerstone to survey gas migration area for upcoming project. Flare shut down at 6:45am to 11:45am due to power shortage and heat wrap was unplugged. Pipe burst in storage room, All log books damages, had to wait to dry. Furnace went down, restarted on 2/5/19 at 6:45pm. Collected data for CLF and RR1. Switched blower A to blower B. Collected data for CLF and RR1. Lubed louvers at flare. Pumped out gas wells on RR1. Gas readings on wells in RR1. Collected data on CLF and RR1. Collected data on CLF and RR1. GEM 2000 and GEM 5000 sent to be calibrated on 3/19/19. No flare readings. Flare shut down from 8:30am to 12:00pm due to ConED working on power line in Ball Field. Received GEM 2000, used to do flare readings. Needs well sites to be reinstalled Collected data on CLF and RR1. Still waiting on GEM 5000 from service. Received GEM 5000 from service, used for readings. Collected data on CLF and RR1 Collected data on CLF and RR1 Gas well readings on RR1 2019 Work and Activity Performed April 23, 2019 • April 26-29, 2019 May 3, 2019 • • • • • • May 6-13, 2019 May 14, 2019 May 17, 2019 Flare went down at 10:40am and 11:00am due to power shortage. Back on at 11:05am Collected data on CLF and RR1. Collected data on CLF and RR1. Flare wet down at 12:17pm to 12:19pm due to power shortage. Collected data on CLF and RR1. Organized data/records for DEC 5yr report Collected data on CLF and RR1.