Graphic Presentation
Value of awards for highway construction
June 1938 May 1038 June 1037
tl2,230,009
$13,571,006
42J.t.71
3. 7.14, 975
2. 930, "t-H
074.012
920.816
l,(m. 135
1,303. 3V4
4. 147
2. 4.S3, 148
18,621,883
614,837 1.821.320 2,479.513 1,008.710
388. 732
191. 2J2
876, .143
161. 123
1. 079. 853
' Preliminary, subject to revision.
' Data for building projects which were located in the cities reporting to the Bureau are included also in tables 1, 2,3,5, 7, 9, and II.
U. S. Def)artment of Labor, Bureau of Labor Statistics.
A. A Tabulation Showing the Total for All Divisions as the First Item Rather Than As the Last.
1. The total of a column may be put at the top of a table, as shown here, instead of at the
bottom.
2. The use of notes to clarify box headings should be encouraged.
SUMMARY OF MEN DISPATCHED FROM CENTRAL HALL
REGISTERED MEN DISPATCHEC
NONREGISTEREO MEN DISPATCHED
Loo,.
Tnidun
ToMi
PcrC*nl
Longshoremen
Trucker*
Truck.
CoiMlt
FlMten
Casualt
Floatera
No.
Par Cent of
Loncih
No
Per
Cant
of
Lon(in
No
Par Cant of
Truck
No
Par
Cant
of
T.w.ck
1Q7J
55.070 70.663 74.724 74.992 84.705 87,304 89.425 96.496 85.475 80.271 60.965 72.508
25.210 29.702 31.248 33.044 34.467 32.033 39.442 39,424 31,146 24,798 21,505 22.289
80.280 100,365 105,972 108,036 119.172 119.337 128.867 135.920 116.621 105.069 82.470 94.797
'69
^1
70 30
71 29 69 31 71 29 73 27
\i.6
14.6 5.7 2.4 2.2 4.2
1926 .
1932.
2.886
5.912 2.743 1.237 1,075
3.2 6.1 3.3 1.5